Difference: AVA (4 vs. 5)

Revision 52006-11-14 - JelenaNinkovic

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Project status

Phase I:

  • Implantation tests and simulations –done-

Phase II:

simple test structures (single cells, small arrays, front illumination)

  • design finished
  • production finished
Changed:
<
<
  • Evaluation of test structures -> June-September 06
>
>
  • Evaluation of test structures -> June-November 06
 

Phase III:

extended test structures

  • Production of arrays, backside entrance window) -> April 07
  • Evaluation of phase III -> June 07

Production of final structures

-- JelenaNinkovic - 08 May 2006 \ No newline at end of file

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback